Data-Tele has become the preferred cable infrastructure contractor in the New York Presbyterian Hospital Eastside York Avenue location, as well as its Westchester based psychiatric facility situated in White Plains New York. In 2005, Data-Tele completed the installation of a redundant six strand fiber backbone throughout the entire psychiatric complex. The project spanned 20 buildings on a 100 acre campus, and required the installation of 25, 00 ft. of 1 inch plenum innerduct, as well as the pulling and terminating of over 45,000 ft of fiber to 20 different building locations through tunnels, walkways, and sub-basement pathways.

At the Eastside York Avenue location, Data-Tele recently competed a 700 cable CAT6 VOIP installation in an offsite office building located at 850 3rd Avenue, as well as numerous floor renovation projects at the hospital itself.
Below are some currently ongoing and recently completed projects between 2010 and 2011.
Westchester Campus, White Plains
October 2004 - January 2006
20 Building redundant fiber backbone design and installation: 25,000 ft 1” innerduct, 47,000 ft 6 strand fiber. Independent pathway support systems. 850 Cat 5e station cables to 20 IDF’S. 20 IDF Room upgrades and build-outs with associated ladder Tray. Campus wide fire-stopping and patching.
Westchester Campus, White Plains
September 2008 – February 2009
Campus wide wireless installation of over 250 wireless access points with associated cabling in all buildings on the campus. Work environments included lock down patient psychiatric wards. 20 different IDF’S were wired to accommodate the wireless installation. Pathway coring and EMT piping installation.
New York Presbyterian at 850 3rd
Avenue (12th Floor)

December 2010 – February 2011
20 Building redundant fiber backbone design and installation: 25,000 ft 1” innerduct, 47,000 ft 6 strand fiber. Independent pathway support systems. 850 Cat 5e station cables to 20 IDF’S. 20 IDF Room upgrades and build-outs with associated ladder Tray. Campus wide fire-stopping and patching.
New York Presbyterian Hospital
Greenburg Building

January 2011 – February 2011
Campus wide wireless installation of over 250 wireless access points with associated cabling in all buildings on the campus. Work environments included lock down patient psychiatric wards. 20 different IDF’S were wired to accommodate the wireless installation. Pathway coring and EMT piping installation.
CONTACT US
Using the contact form to send us email at below
KEEP IN TOUCH WITH US
You can use the following information to contact us if you'd like to reach out directly to our management team.
Or come visit us at:
  • Data-Tele Contractors Inc.
  • 295 Bergen Turnpike, Unit E
  • Ridgefield Park, NJ 07660
  • Tel: 201-229-0229
  • Fax: 201-229-0199